» Key points in 30 seconds

  • First the goal - new clients, partners or a new market. The stand, the team and who you talk to on site all depend on it.
  • For B2B, specialized shows almost always work, not general ones like CES or MWC.
  • A stand in Europe costs €700-1,000 per m² plus €250-600 for space rental. The remaining costs are planned in advance, not a month before opening.
  • Start 4-5 months ahead: 80% of the result depends on what is done before the show.
  • Meetings are booked before you arrive - and you plan for half of them not to show up.

Contents · 6 sections

Most companies choose a trade show by its name and count the budget only after they have signed the contract for the space. The order should be the reverse. The first question in preparation is why you are going there, and the answer decides everything else: the size of the stand, the makeup of the team, who to look for in the aisles. Below are the notes from the webinar "International Exhibitions Without Mistakes", which we held with Nazar Malets, founder of Awide: a company from Cologne and Lviv that has designed and built exhibition stands for more than ten years.

A goal, not a stand

New clients, partners or entry into a new market are three different trade shows, even if they have the same name. The goal decides which stand you need, which of the team goes and who you talk to on site. Without an answer to this question, every other decision is made at random: the space is chosen "like the neighbor's", and the stand is staffed by whoever is free. A trade show is one of the most expensive tools in B2B, so a mistake here costs not a reworked presentation but the entire participation budget.

Two company representatives talk to a partner in the meeting area of the stand.
The meeting area of a stand: the goal decides how much room to give to conversations.

Specialized or general

An aisle at a specialized medical equipment show, an exhibitor shows a device to two distributors.
A specialized show: wholesalers and distributors.

Specialized shows bring together one narrow industry - medical equipment, elevators, packaging - and the people who come are wholesalers, distributors and partners, that is, people with a budget and the right to sign. General shows, such as CES or MWC, cover several industries at once and are closer to B2C in audience: there is more press, more bloggers and more random visitors. According to Nazar, for B2B the first kind almost always works, with one exception - when you are launching a product that specifically needs broad media coverage.

Specializedone industry · wholesalers, distributors, partners with signing authority
vs
Generalseveral industries · press, bloggers, random visitors

A check before you decide

Once the type is clear, check the show against four signs: whether it is held regularly, whether big players and your competitors go there, who the media partners and sponsors are, and which exhibition center it takes place in. Regularity shows that the event is alive and not a one-off project of the organizer; the presence of competitors shows that the market is really there. You can search on 10times.com, on the websites of exhibition centers, or simply write to the organizers: say who you are and which industry you are in, and ask them to recommend an event for your profile.

  1. 01It is held regularly
  2. 02Big players and competitors go
  3. 03Who the media partners and sponsors are
  4. 04Which exhibition center

The numbers nobody mentions

According to Awide's estimates, given at the webinar, design and construction of a custom stand in Europe cost €700-1,000 per square meter, in the US $1,200-1,800; renting the space itself adds another €250-600 per meter depending on the city and the reputation of the event. This is the part everyone counts. Then comes the part people remember a month before opening: electricity and internet, plus €250-500, hanging points, water, cleaning, security, parking, product delivery, and €800-1,200 for each person on the team for travel, accommodation and meals. Handouts, gifts, pre-event advertising and photography are often left out of the budget entirely - and the money is then looked for along the way.

WHAT PARTICIPATION IN EUROPE COSTS · AWIDE ESTIMATES

  • Stand design and constructionper m² in Europe · $1,200-1,800 in the US€700-1,000
  • Space rentalper m², depending on the city and the event€250-600
  • Electricity and internetper stand€250-500
  • Teamper person: travel, accommodation, meals€800-1,200

Example: a 16 m² stand, a team of 3

€17,850 - €29,700in total, without handouts, gifts, advertising and photography
  • Stand construction€11,200-16,000
  • Space rental€4,000-9,600
  • Team, 3 people€2,400-3,600
  • Electricity and internet€250-500

Often forgotten in the budget:

hanging pointswatercleaningsecurityparkingproduct deliveryhandoutsgiftspre-event advertisingphotography
» Calculate the budget for your stand

Trade show preparation calendar

Nazar advises starting preparation four to five months before the opening. Participation itself, together with assembly and teardown, takes 5-10 days, and by his estimate 80% of the result depends on what was done before those days. The logic is simple: at the show itself you can no longer change anything - not the stand, not the team, not who knows about you. A company that started a month ahead spends those days getting acquainted; a company that started five months ahead spends them on negotiations.

Stand assembly the day before opening: the frame, the lighting truss, cables on the floor.
80%of the result - before the show5-10 daysassembly, show, teardown
−5 mo−4 mo−3−2−1opening
Assembly the day before opening: by this point nothing can be changed anymore.

Meetings before you arrive

Those months are filled with more than producing the stand. The meeting calendar is built in advance - through the show's LinkedIn event, the organizer's official app and the database of participants. At MWC Barcelona in early 2025, the LinkedIn event gave our client 165 conversations and 13 agreements to meet; together with the app and direct outreach it came to 41 meetings scheduled at the stand. 21 took place - half of the people did not come, and that is normal statistics that you should build into the plan in advance.

A manager at a laptop with a meeting calendar, next to a plan of the exhibition hall and a badge.

MWC BARCELONA 2025 · CLIENT CASE

165conversations from the LinkedIn event
41meetings scheduled
21took place
The meeting calendar is built months before you arrive.

Whoever goes to show the stand pays for square meters and brings back photos.Whoever goes for specific meetings pays for the same meters but brings back a calendar.

Nazar Malets

Article expert

Nazar Malets

founder of Awide: 10+ years designing and building exhibition stands, Cologne and Lviv

» Turnkey stands with Awide

New - first in the channels.

A new article or breakdown comes out here first. Pick the network that suits you.

Comments

No comments yet. Which trade show are you preparing for?